Goulburn Sewerage Augmentation – Ross Street STP Upgrade
Client: Ledonne Constructions
This project commenced in February 2007 with handover occurring October 2007. The project involved upgrading the capacity of the main sewerage treatment plant (STP) for Goulburn.
The existing plant was to remain functional while the following was carried out:
- New 1400amp electrical supply.
- New main switchroom + switchboards.
- Replace 3 existing effluent pumps to larger capacity.
- Install 3 new storm pumps.
- Remove old switchroom and rewire existing controls into new switchroom.
- Upgrade level controls in existing effluent tank.
- Install new level controls to existing catch/balance tank.