Queanbeyan Morissett Street Sewerage Pump Station Upgrade
Client:
Ledonne Constructions
The scope of work is as follows:
- Installation of 1250amp capacity mains cables from substation.
- Manufacture + install main switchboard.
- Underground conduit system between switch room, wet well, generators & bio-filter.
- Wiring of 2 generators and auto transfer switch.
- Installation + wiring of a 150amp active harmonic filter.
- Installation of the specified Telemetry system.
- Wiring of the bio-filter ventilation fans and control panel.
- Installation of 4 x 250Kw variable speed drives.
- Wiring of 4 x 250Kw submersible pump motors.
- Installation of a level control system for the wet well.
- Installation of a flow meter + calibration.
Wiring of the new main switch room. - Re-supply existing workshop distribution board.
- Installation of a security system for the new main switch room.
- Area lights + general purpose power points.
- Wiring of the overhead maintenance wet well crane.
- Programming of the Omron PLC.
- Commissioning and calibration of the instrumentation controls.
- Wet commissioning of the 4 x 250Kw submersible pumps to Queanbeyan Council’s standards.
- Maintenance manuals, onsite training and operational procedures.
- WAE drawings.