Queanbeyan Morissett Street Sewerage Pump Station Upgrade

Conduit InstallationClient: Ledonne Constructions

The scope of work is as follows:

  • Installation of 1250amp capacity mains cables from substation.
  • Manufacture + install main switchboard.
  • Underground conduit system between switch room, wet well, generators & bio-filter.
  • Wiring of 2 generators and auto transfer switch.
  • Installation + wiring of a 150amp active harmonic filter.
  • Installation of the specified Telemetry system.
  • Wiring of the bio-filter ventilation fans and control panel.
  • Installation of 4 x 250Kw variable speed drives.
  • Wiring of 4 x 250Kw submersible pump motors.
  • Installation of a level control system for the wet well.
  • Installation of a flow meter + calibration.
  • Biofilter Construction Wiring of the new main switch room.
  • Re-supply existing workshop distribution board.
  • Installation of a security system for the new main switch room.
  • Area lights + general purpose power points.
  • Wiring of the overhead maintenance wet well crane.
  • Programming of the Omron PLC.
  • Commissioning and calibration of the instrumentation controls.
  • Wet commissioning of the 4 x 250Kw submersible pumps to Queanbeyan Council’s standards.
  • Maintenance manuals, onsite training and operational procedures.
  • WAE drawings.

 

 